Transformation

Prioritisation is overrated, how to juggle multiple programmes, projects and BAU and support the people who have to live with it

“Focus on the top three.” “Say no more often.”

Useful advice, but rarely enough when customer escalations, regulatory deadlines, audits and operational incidents keep adding work to the system.

Multiple programmes, projects and BAU often run concurrently. The real issue is not just too much work. It is whether people have the capacity, capability and support to carry it sustainably.

Without that support, the result is context-switching, firefighting, slower delivery, diluted quality and burnout.

Managed juggling means making concurrent demand visible, protecting capacity, resolving conflicts early and making portfolio decisions that actually stick.

The goal is not perfect focus. It is a system that supports people through the concurrency reality creates.

#PortfolioManagement #ChangeManagement #ProjectManagement #Leadership #CapacityPlanning #PMO

Axis of Action 24 November 2026
Prioritisation is overrated, how to juggle multiple programmes, projects and BAU and support the people who have to live with it

Prioritisation is necessary, but it is not sufficient. In organisations facing regulatory deadlines, system upgrades, customer escalations, operational incidents, audits and unexpected discoveries, multiple programmes, projects and business-as-usual (BAU) work will often run concurrently. The real leadership challenge is not to pretend this can be eliminated; it is to make that concurrency visible, govern it deliberately, and support the people who must carry it.


The portfolio-meeting problem

Most leaders recognise the familiar monthly portfolio meeting: status decks, RAG reports, discussions of risk, investment, capacity, urgency and strategic alignment, followed by earnest talk about what should be stopped, paused or deprioritised. Then the meeting ends and the list of initiatives often remains the same, becomes longer, or simply reappears under different names.


Leaders leave with no greater clarity and return to protecting their own areas of responsibility. Meanwhile, the people delivering both change and the day job continue to juggle and navigate the shifting landscape. 


The result is predictable, shared people are pulled in several directions, context-switching rises, hand-offs slow, quality suffers, BAU becomes firefighting, and project benefits arrive late or incomplete. Customers experience inconsistent service; employees experience overload, eroded confidence and disengagement.


Why “focus on the top three” fails

Advice to “limit yourself to the top three,” “protect the critical few,” or “say no more often” is clean in theory but often unrealistic in practice. Some work cannot simply wait. A regulatory deadline has a fixed date. An audit finding may invalidate a delivery assumption. A technical discovery can make a current plan unsafe or unviable. Customer escalations and operational failures demand immediate attention.


Stopping work that remains strategically or operationally necessary carries its own risks. In these conditions, pure prioritisation becomes an aspiration rather than an operating model. Organisations do not fail because they have too many priorities in the abstract; they fail because they lack the structures to manage simultaneous demands without transferring the resulting friction downward to individuals and teams.


Managed juggling, not unmanaged overload

The alternative is managed juggling, treating concurrent work as a condition to be governed deliberately, rather than a personal resilience test for the people doing the work.


Managed juggling requires regular, explicit decisions about:

  • Staggering delivery and sequencing interdependent work.
  • Resolving resource conflicts before they become crises.
  • Protecting capacity for BAU, recovery and unexpected demand.
  • Allocating investment and making real stop, pause or continue decisions.
  • Managing risks, issues, dependencies and interdependencies.
  • Developing the capability people need to make trade-offs under pressure.
  • Tracking performance against KPIs, SLAs and customer requirements.
  • Responding quickly when priorities legitimately change.


The objective is not perfect focus. It is competent management of the concurrency that reality imposes.


Support people, not just portfolios

The deepest leverage is not another prioritisation framework. It is the design of the processes, capacity and capability that allow individuals, teams and the enterprise to operate sustainably under sustained concurrent demand.

LevelWhat must be designed
IndividualProtected focus time, clear priorities, realistic workload limits, support for switching costs, and permission to raise overload early
Group / teamShared visibility, explicit hand-off rules, capacity conversations that produce decisions, and psychological safety to surface overload
EnterprisePortfolio governance that can stop or pause work, dynamic reallocation rules, and structures that hold change and BAU together

When process design exists only at the enterprise level, individuals and teams become the shock absorbers. They absorb conflicting instructions, unrealistic deadlines, fragmented attention and the emotional cost of being asked to do everything at once.


Capacity must be visible and protected. Without a current view of non-BAU work and the people supporting it, every request feels equally urgent. Time for BAU, recovery and unplanned demand needs to be explicitly reserved. Chronic over-allocation should be treated as a governance failure, not an individual resilience issue.


Capability must be built deliberately. Leaders and teams need the confidence, skills and practical tools to make trade-offs, manage interdependencies, reduce harmful multitasking and maintain performance under pressure. They also need behavioural support to move from “protect my work” to “protect the system’s ability to deliver.”


What works in practice

Several organisations show that structured approaches can improve outcomes even when total work volume remains high.


Embraer applied Critical Chain Project Management (CCPM) across product development and maintenance environments. For the E190-E2 programme, it delivered a complex new mid-range aircraft in five years, one month ahead of schedule; the approach used work-package buffers and “fever chart” monitoring to focus attention where buffer consumption signalled emerging risk. At its Executive Jets maintenance centre at Le Bourget, Embraer reduced heavy C-check downtime from roughly 10 weeks to five weeks, while reporting a substantial productivity improvement


The common practices were not magic. They reduced harmful multitasking, improved planning of shared resources, created clearer priorities, and used buffer consumption to direct management attention. In other words, they made capacity and constraints visible so that people could work to a coherent system rather than react to the loudest demand.


Microsoft’s Customer Service and Support organisation undertook a multi-year effort to establish portfolio governance across a large international division. Its objectives included improving portfolio visibility, aligning work with strategy, improving accountability for benefits, and enabling better prioritisation of projects and limited resources. The lesson is not that governance removes concurrency; it is that governance gives leaders better decision rights and teams clearer boundaries. 


CBIZ illustrates the importance of controlling what enters the system. By evaluating initiatives against both business impact and cultural impact before allowing them to proceed, organisations can avoid leaving people to absorb unlimited demand. The discipline is not merely choosing the “best” projects; it is deciding whether the organisation has the capacity and cultural readiness to absorb another change.


Frameworks that help

No framework creates additional capacity. But several can improve the quality of decisions about what is started, protected, paused or re-sequenced.

  • Project Portfolio Management (PPM): Creates visibility across change work, applies explicit criteria, and enables governance that can stop, pause or re-sequence initiatives.
  • Critical Chain Project Management (CCPM): Addresses resource constraints and multitasking directly, using buffers and buffer consumption to guide priorities and reallocation.
  • PMO and leadership structures: Provide a coordination layer that connects programmes and projects while protecting core operations.
  • Capacity and WIP limits: Draw on lean and agile principles to make concurrent load visible and constrain the number of active items individuals or teams carry.
  • Dynamic portfolio rules: Accept that priorities shift and provide transparent bases for reallocation based on risk, urgency, capacity and interdependencies.
  • These approaches work best when they are lightweight enough to be used, and when they produce decisions rather than more reporting.


Practical moves

  1. Create one current view of all non-BAU work and the people supporting it. Without shared visibility, every new request feels equally urgent.
  2. Protect capacity explicitly. Reserve time for BAU, recovery and unexpected demand. Treat persistent over-allocation as a design and governance failure.
  3. Limit harmful multitasking. Prefer fewer concurrent assignments per person. Use time-boxed focus periods and clear priorities when switching is unavoidable.
  4. Make portfolio conversations decision-forcing. Require explicit stop, pause, continue or re-sequence outcomes. Track whether the portfolio actually shrinks or merely changes names.
  5. Stagger delivery and sequence interdependent work. Avoid simultaneous peaks that overload the same scarce skills or the same operational teams.
  6. Review the system on a short cycle. Capacity, risks, issues, investment, KPIs, SLAs and customer requirements should be reviewed often enough to absorb surprises before they become silent overload.
  7. Apply project discipline to BAU where useful. Operational improvements often benefit from clear scope, milestones, risk management and benefit tracking, especially where change is continuous.
  8. Support people deliberately. Build capability, confidence and constructive mindsets alongside process design. Psychological safety and realistic expectations are not soft extras; they determine whether people can surface overload before it becomes burnout or disengagement.


Change that holds

Many organisations now operate in near-continuous change. The boundary between “project” and “BAU” has blurred, and project methods are increasingly applied to operational work. That makes juggling more permanent, not less.


In this environment, whether change holds depends on more than the quality of the business case or the strength of the prioritisation conversation. It depends on whether the organisation designs processes that support individuals and groups as well as the enterprise; whether it protects capacity rather than merely demanding resilience; and whether it builds the capability people need to make sound trade-offs under pressure.


Prioritisation matters, and organisations that never choose what not to do will eventually do everything poorly. But the more realistic goal is not the fantasy of perfect focus. It is a system in which concurrent programmes, projects and BAU are visible, governed and supported so that people are not left to carry the difference between what the organisation has promised and what it has capacity to deliver.